Case Study

Zero VOC Emissions at a Petrochemical Tank Farm

PROTEGO ZETOP emergency valve

Zero Emissions

Background

A major petrochemical operator in Thailand was under increasing pressure to reduce fugitive emissions from benzene storage tanks. The facility relied on ageing breather valves Pressure and vacuum relief valve A pressure and vacuum relief valve is a pressure equalization valve for impermissible pressure and vacuum in a closed system. and emergency vent valves that exhibited heavy leakage, preventing compliance with zero-VOC performance requirements. 

Routine gas detector readings consistently indicated vapor escape at the tank roof, creating both environmental and safety concerns
As part of a plant-wide initiative to tighten emissions control, the operator sought a certified, verifiable solution capable of delivering zero leakage at tank operating pressure Operating pressure Operating pressure is the pressure existing at normal operating conditions within the system being protected.

Zetop China VD/TS Installation

Solution

The operator engaged PROTEGO® to evaluate the existing tank venting arrangement and recommend a suitable low-leakage replacement. 

Based on tank service conditions and the sensitivity of benzene vapor handling, PROTEGO® supplied ZETOP zero-emission valve technology engineered to achieve bubble-tight sealing at tank operating pressure. 

Zero leakage

The upgrade included the installation of PROTEGO® ER/V, V/SV, and PM-HF series valves sized to the tank’s low-pressure duty. After installation, the site’s engineering team conducted a field verification using calibrated gas detectors positioned on top of the tank roof. 

Result

The post-installation emissions assessment confirmed a zero ppm VOC reading, demonstrating complete elimination of vapor leakage at operating pressure. Key outcomes included: 

 

  • Zero VOC emissions detected during site measurements (verified via gas detector).
  • Full containment of benzene vapor, supporting regulatory compliance and environmental performance targets.
  • Replacement of all previously leaking devices with certified PROTEGO® ZETOP valve technology.
  • Long-term reliability, validated through on-site tests conducted months after commissioning. 

A senior engineering representative noted that the upgrade successfully met their zero-VOC requirement and resolved a longstanding emissions challenge. 

Our measurements confirmed zero vapor leakage after installing PROTEGO® valves. The solution fully met our zero-emission goal.

Senior Engineer

More Case Studies

Flame Arrester Replacement on a Deep-Water FPSO

Solved Leak Problem

Zero Emission at Tank Operating Pressure

Floating Suction Units for clean fuel withdrawal

Misapplied Flame Arresters